![]() |
|
Drilling and Well Workovers |
East Siberia
In 2009, the region is to be further serviced by: — 2 drilling crews; — 1 well test crew; and — 2 rig up/down crews. Two Uralmash 3D drilling rigs are to be constructed in the region (including 1 rig of 3D-76 type and 1 rig of 3D-86 type). |